[关键词]
[摘要]
以企业电机转子车间为试验环境,生产YX3-90L-2转子的整个工艺流程为研究对象,利用工序分析法对车间内每道工艺流程分析并记录,从车间平面布置方向进行模拟研究,提出一种转子车间平面布置方法。新方法节省了2道工艺流程,转子搬运距离从546.10 m缩短至198.38 m,转子运输时间从1 053 s缩短至736 s,避免转子交叉运输5次。减少了转子的搬运距离和搬运时间,提高了转子的生产效率和企业的产能。
[Key word]
[Abstract]
Taking the motor rotor workshop of an enterprise as the experimental environment and taking the whole process of producing YX3-90L-2 rotor as the object, the process analysis method is used to analyze and record each process flow in the workshop, and simulation research is carried out for the workshop plane layout. A rotor workshop plane layout method is proposed, which saves 2 process flows and shortens the rotor handling distance from 546.10 m to 198.38 m. The transportation time of rotor is shortened from 1 053 s to 736 s, avoiding 5 times of cross transportation. The rotor handling distance and time are reduced, so that the rotor production efficiency as well as the production capacity of the enterprise is improved.
[中图分类号]
[基金项目]
motor production; industrial engineering; motor rotor; process analysis method; workshop reconstruction; process flow