    In order to obtain the optimal power scheduling scheme of the wind farm, the input value of the wind speed at any time must be mastered, and then the output power of each wind turbine was obtained. When the measuring instrument of wind speed fails to work properly, the wind speed data of the wind turbine would be wrong or missing. The equation of linear regression was established to find out the relationship among the input wind speed of every unit which could get the wind speed value. When idling abandoned wind occurd in the wind field,the power command would be issued by the grid management department. And the wind farm would produce the active and reactive power with the specified size. Taking the minimum loss of all doubly fed induction generator in wind farm as the objective function, the scheme of active and reactive power dispatch was determined. The model of wind field was established by software MATLAB, and the simulation results verified the feasibility of the scheduling model.

    Reference
    Related
    Cited by
Get Citation

HU Qinglin, FU Pan, HU Zhonglin, YANG Peihong. Power Scheduling Analysis of Wind Farm Power Dispatch Lacking ofWind Speed[J]. Electric Machines & Control Application,2017,44(6):104-108.

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 09,2019
  • Published:
You are thevisitor
沪ICP备16038578号-3
Electric Machines & Control Application ® 2025
Supported by:Beijing E-Tiller Technology Development Co., Ltd.

沪公网安备 31010702006048号