Simulation Study on Motor Transient PerformanceSteamElectric Double Drive System
DOI:
Author:
Affiliation:

(1.School of Electrical Engineering, Shanghai Dianji University, Shanghai 200240, China;2. Shanghai Electric Group Shanghai Motor Factory Co., Ltd., Shanghai 200240, China)

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
    Abstract:

    For the threephase asynchronous motorgenerator of a “steamelectric doubledrive” system of shanghai Motor Factory Co., Ltd., which was 6 800 kW, 750 r/min, the transient performance was analyzed based on Ansoft software using fieldcircuit coupling method. Analyses and calculations were carried out for three different conditions: noload start, fan load start, and big load start. The process of the motor being switched from the state of motor to the state of generator was simulated. Instantaneous starting current, electromagnetic torque, the air gap flux density and other electrical parameters of the threephase asynchronous motorgenerator in different states were obtained. The transient performance of the asynchronous motor and the corresponding electromagnetic field distribution were analyzed.

    Reference
    Related
    Cited by
Get Citation

YAN Xinyang, XU Yufa, SUN Minglun, PENG Dahua. Simulation Study on Motor Transient PerformanceSteamElectric Double Drive System[J]. Electric Machines & Control Application,2018,45(9):112-116.

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:April 25,2018
  • Revised:
  • Adopted:
  • Online: December 17,2019
  • Published:
You are thevisitor
沪ICP备16038578号-3
Electric Machines & Control Application ® 2025
Supported by:Beijing E-Tiller Technology Development Co., Ltd.

沪公网安备 31010702006048号